Major work from the last 30 years

1994: Reconstruction of tram tracks on The Grand Boulevard in Budapest

From 2003: modernisation of the M2 pier line

2007: renovation of the Újpest Bridge in Budapest

2009: Complete reconstruction of tram line 19 between Döbrentei Square and Batthyány Square

From 2011: construction of surface and tunnel tracks of the M4 metro

2013: Construction of Kossuth Square, tram 2

2014: Renovation of tram line 1

2014: Renovation of tram line 3

2014: renovation of the Tisza Bridge in Szolnok

2015: Reconstruction of Széll Kálmán Square

2015: Construction of buda's spinning tram network

2016: Renovation of Béla Bartók Road and St. Gellért Square

2017: Construction of budafok carriage theatre hall tracks

2017: Modernisation of M3 metro line

2018: Reconstruction of the section of the tramway between Blaha Lujza Square and Rákóczi Square

2018: Orczy tér crossings, reconstructions of switches and crossings

2018-2019: Partial renovation of the Tisza Bridge of Kisköre common road-rail

2018-2021: Tram-train track construction in BeaverFields on the urban section

2019: Construction of the section of the tram line between Corvin district and Goldmann György Square

2019: Construction of the section of the tramway between Hay Square and Mechwart Grove

2020: Haller Street – Soroksári út track connections renovation, construction of delta tracks

2021: Szeged Tram-train vehicle yard hall tracks construction

From 2021: Modernization of the Southern Connecting Railway Danube Bridge

Tram line 1

Tram line 3

Metro M4

Széll Kálmán square

 

Tarnok platform construction

Tram line 4 in Szeged

Metro M3

Buda spinning tram

Kossuth square